ADU Permits in Turlock: a Homeowner's Guide
Turlock is fully electronic for ADU submittals — and its published fee schedule makes one thing clear: staying under 750 square feet saves you real money.
Last updated October 2026. Rules change; always confirm current requirements with the city before you build.
Who handles your permit
The City of Turlock Development Services Department — Building & Safety Division handles ADU permits from 156 S. Broadway, Suite 130, Turlock — (209) 668-5560. All projects must be submitted electronically in PDF format via a link provided by staff; a plan check deposit is due with the application, and projects needing more than three plan checks pay additional fees.
What you can build
Free plansStanislaus County pre-drawn ADU library available in Turlock
E-submittalAll projects submitted electronically via a staff-provided link
<750 sq ftExempt from capital facility impact fees under state law
~$8.5k–$10.2kListed capital facility fee for a 2nd unit at 750+ sq ft
TIDTurlock Irrigation District — electric and water
60 daysMinisterial decision on a complete application
The Stanislaus County pre-drawn plans — and Turlock's fee table
Stanislaus County partnered with Turlock, Modesto, Ceres, Oakdale, Riverbank, and Waterford to produce pre-drawn ADU plans for detached new construction — from a 260 sq ft studio to a 1,192 sq ft 3-bedroom — with multiple exterior finish options, free to property owners. Using them skips most structural plan check; your submittal centers on the site.
Watch the fee table: Turlock's capital facility development fee schedule lists roughly $8,500–$10,200 (indexed) per 2nd unit at 750 sq ft and above — but state law exempts units under 750 sq ft from those fees. Sizing just under the line is the single biggest fee decision you'll make.
What goes into the submittal
- Building permit application — complete every line (mark N/A where it doesn't apply); plan check deposit payable by cash, check, or online.
- Plot plan drawn to scale (three sets per the city's checklist): parcel dimensions, structure locations, driveway, easements, wells/septic, and setbacks from property lines, structures, pools, and water supply.
- Floor plan — not required when using the pre-checked plans; foundation details likewise.
- Fire sprinkler plans if the main dwelling is sprinklered.
- Stormwater worksheet — Turlock requires an erosion/sediment control worksheet or SWPPP for grading work.
Where applications usually get stuck
- The 750 sq ft fee cliff. A unit that creeps over 750 sq ft triggers the full capital facility fee — lock the size early.
- Electronic submittal format. PDFs must be complete for the staff-provided link; civil, landscape, and fire-system drawings are not part of the building submittal and go to other departments.
- TID coordination. Electric service and meter work run through the Turlock Irrigation District — a separate queue from the city.
- Agricultural edges. Parcels near Williamson Act contract land on Turlock's fringe can face compatibility and setback questions.
- Solar as a separate track. New detached ADUs carry roof-mounted PV — recent Turlock ADU permits pair the ADU with a separate solar system permit, so sequence it.