ADU Permits in Redwood City: a Homeowner's Guide

What you can build, which permits you need, and how the review actually works — in plain language.

Last updated October 2026. Rules change; always confirm current requirements with the city or county before you build.

Who handles your permit

ADU permitting in Redwood City runs through the Community Development & Transportation Department — the Planning Division is at City Hall, 1017 Middlefield Road, Redwood City, CA 94063, (650) 780-7234, planning@redwoodcity.org. Planning applications for single-family, duplex, and triplex projects are emailed as PDFs to the planning desk; the building permit then follows the building division's own submittal list. One Redwood City signature: neighbor notification happens before you submit, not after — for architectural permits, neighbors are notified and acknowledged first, then the application goes in.

What you can build

California state law sets the baseline, and Redwood City follows it:

1,200 sq ftMax for a detached ADU
16 ftHeight limit for most detached ADUs
4 ftMinimum rear and side setbacks for detached ADUs
1 + 1One ADU plus one JADU allowed per single-family lot
30 daysExpedited review window on the pre-reviewed track
750 sq ftADUs below this size are exempt from impact fees

"Pre-reviewed" ADU designs — not "pre-approved"

Through a long-running partnership with the Housing Endowment and Regional Trust (HEART) of San Mateo County, Redwood City offers pre-reviewed ADU designs — and a city planner puts it plainly: "preapproved" can be misleading, because staff still review every application. On the expedited track, the city reviews within 30 days for compliance with local standards and building codes. Redwood City also participates in San Mateo County's ADU Resource Center collaboration linking homeowners and designers.

Ask the planning division for the current design list — studio, one-bedroom, and two-bedroom options have been added over time. Site-specific work (plot plan, siting, setbacks, utilities) is always on you.

Pre-approved doesn't mean permit-free. You still need a building permit, and reviewers still verify site placement, foundation conditions, utility connections, and fire access for your specific property.

What goes into the submittal

Where applications usually get stuck

Not sure where to start? That's the part we do. We look at your property, map the requirements, coordinate the plans and specialists, and manage the submittal and corrections — one point of contact.