Permit guides
Menlo Park's lots hide the details that make or break an ADU: heritage trees, clay soil, and side yards barely wide enough to carry lumber through.
Last updated October 2026. Rules change; always confirm current requirements with the city before you build.
ADU permits in Menlo Park run through the Community Development Department (Building, Planning, and Housing divisions). One thing to know upfront: fire protection comes from the Menlo Park Fire Protection District — a separate special district, not a city department — so fire approval is its own coordination track.
Before paying for drawings on a Menlo Park lot, gather answers to these — any one of them can change the design:
Menlo Park expects a complete plan set: area plan, site plan, streetscape, existing and proposed floor plans and elevations, sections, square-footage and coverage calculations, landscape and open-space diagrams, roof plan, grading and drainage, utilities, and erosion control. Projects near older structures may need a historic significance evaluation, and a color and materials board goes in as its own plan sheet.
Access is the hidden constraint. Many lots in neighborhoods like Allied Arts and the Willows have narrow side yards — materials arrive by hand and excavation uses small equipment. It doesn't stop the project, but it lengthens the schedule. Separately, plan coordination time for a new address, a separate meter if you want one, sprinklers in some cases, and the sewer lateral connection.
Not sure where to start? That's the part we do. We check your property against the requirements, coordinate the plans and specialists, and manage the submittal and corrections — one point of contact.
Not sure where to start? That's what we're here for.
Send your projectErik — (916) 540-8960 · Vall — (916) 956-8106
office@pcg-engineering.pro