Who handles your permit

In Dixon, ADU permits run through the Building Department at 600 E A Street, Dixon, CA 95620 — Building@cityofdixonca.gov. Submittals go through the Dixon Civic Access Portal (DCAP). One Dixon-specific rule to know upfront: fire sprinkler plans are a separate submittal directly to the Fire Department — they don't ride along inside the building permit package.

What you can build

1,200 sq ftMax for a detached ADU under state law
16 ftHeight limit for most detached ADUs
4 ftMinimum side and rear setbacks, detached ADUs
1 + 1One ADU plus one Junior ADU per single-family lot
$0 feesNo impact fees for ADUs under 750 sq ft statewide
60 daysState deadline to act on a complete application

Dixon-specific things to know

Budget the fee stack before you design. Dixon's impact-fee list is one of the longer ones in the corridor. Staying under 750 sq ft keeps the state impact-fee exemption in play and simplifies the budget — design to the threshold, not past it.

What goes into the submittal

Where applications usually get stuck

Not sure where to start? That's the part we do. We map Dixon's fee stack and the separate fire track for your parcel, and manage the submittal and corrections — one point of contact.