A small Marin town with its own ADU ordinance, pre-approved plans, and extra attention on wildfire and flood zones. Here's how the permit works.
Last updated October 2026. Rules change; always confirm current requirements with the city or county before you build.
Permits run through the Community Development Department, Building Division — Town Hall at 300 Tamalpais Drive, Corte Madera, CA 94925 (plcounter@cortemadera.gov). Interior conversions that qualify as statewide-exempt ADUs skip the separate ADU permit and go straight to a building permit application, with the Town's ADU checklist filed to Planning at the same time.
California state law sets the baseline:
Two local twists: attached ADUs and detached units over 800 square feet get a 10-day courtesy notice mailed to property owners within 300 feet — no hearing, but neighbors are informed. And every JADU needs a recorded deed restriction (no separate sale, no rentals under 30 days) before the building permit issues.
The Town publishes pre-approved detached ADU plans with a site-specific checklist: cover sheet, owner and APN details, zoning, the Town's assigned plan number, and any hazard-zone designation. It's a solid shortcut — but read the hazard designation carefully. The Town enforces wildfire-hardened construction rules in its designated WUI fire areas.
Fire and flood maps decide a lot here. Check your parcel against the Town's WUI fire-area map and flood zones before committing to a plan — they drive materials, elevation, and review requirements.
Not sure where to start? That's the part we do. We look at your property, map the requirements, coordinate the plans and specialists, and manage the submittal and corrections — one point of contact.
Not sure where to start? That's what we're here for.
Send your projectErik — (916) 540-8960 · Vall — (916) 956-8106
office@pcg-engineering.pro